St John Harbour Bridge

Fast Track Critical Timeline Project

slide106

National Infrastructure was awared the hydrodemolition contract to remove approximately 300,000 square feet of concrete to depths of 1 inches below the rebar, at 3,500 to 4,000 square feet per shift.

NATIONAL INFRASTRUCTURE™

corpmap
  • 20240 102B Avenue
  • Langley, BC V1M 3G9
  • British Columbia
  • Canada

National Infrastructure

provides quality, high speed hydrodemolition services
throughout 
USA and Canada.