Bow Trail East Bridge

Fast Track Critical Timeline Project

bowtrail

Why general contractors of large infrastructure projects use National Infrastructure™

  • THREE THOUSAND FIVE HUNDRED to FOUR THOUSAND SQUARE FEET PER SHIFT
  • CONSISTANT REMOVAL TO 1 INCH BELOW REBAR
  • NO PROJECT SLIPPAGE
  • EXCEPTIONAL SAFETY RECORD
  • COMPETETIVE RATES

A job well done not only includes timely service. It must be of the highest quality as well. We pride ourselves in completing hydrodemolition services with the highest quality surface preparation in the industry as shown in the above video.

 

NATIONAL INFRASTRUCTURE™

corpmap
  • 20240 102B Avenue
  • Langley, BC V1M 3G9
  • British Columbia
  • Canada

National Infrastructure

provides quality, high speed hydrodemolition services
throughout 
USA and Canada.